When a company once again entrusts ALTERTECNIA with a new project, the work starts from prior knowledge of the facility, its operations and its technical requirements. That was the case with this project for a company in the bakery sector, which needed to add a new silo.

The brief involves extending an existing industrial building to install a new raw-material storage point, also connected to the system already in place at the plant. The project requires resolving the structure, envelope, fire compartmentation and technical coordination on a facility in operation.

How to approach an industrial extension: key aspects

With a new-build project, the design is based on a vacant plot and a buildable framework defined from the outset. In an extension, the starting point is very different: there is an existing building, an established pattern of use and a series of predefined elements that condition any subsequent intervention.

Here, the new installation must be integrated into the current building and linked to the existing system. This requires us to study precisely the available geometry, the connection points, the effect of the new structural load and the relationship between the extension and the main building.

The intervention has to fit into the whole, both technically and constructively. These are the key aspects:

New steel structure and roof adaptation

The designed solution is based on a new steel structure intended to support the installation of the new storage element. This structure must connect to the existing silo.

In addition, fire compartmentation from the existing building is planned, in order to ensure proper separation and protection between the two areas.

To carry out this work, the existing roof had to be partially demolished. Then, once the installation is in place and the corresponding structural adaptation is completed, it will be replaced with a new envelope and roofing solution.

This sequence conditions both the construction process and the prior definition of the design, because each phase affects the next.

Fire compartmentation and improved fire performance

The extension does not just add a new structure; it also requires a review of the relationship between the new area and the existing building. In this context, the design provides for the division into fire sectors to ensure proper compartmentation and protection within the industrial complex.

As for the envelope and roofing solution, it will be built with fire-rated sandwich panels. This is a technical decision aimed at improving performance in the event of a fire, reinforcing the separation between sectors and providing higher construction quality.

silo industrial building extension

BIM coordination between structure, architecture and building services

One of the most significant aspects of the work has been the BIM coordination between two specialist teams:

  • The structural part was developed by a company working in a BIM environment.
  • In parallel, at ALTERTECNIA we have developed in Revit the BIM model for the architecture and building services, tailoring the intervention to the existing building and to the needs of the project.

Subsequently, both models were integrated into a common Revit model. This coordinated model makes it possible to check for clashes, detect overlaps and verify compatibility between structure, architecture and building services before construction.

In an extension to an existing building, this level of coordination is particularly useful to anticipate conflicts and define the intervention more precisely.

In this project, the collaboration between Tekla and Revit made it possible to achieve a level of control suited to the demands of this type of intervention. The result is a well-resolved technical basis for tackling the extension, integrating the new silo and carrying out the work with a coordinated view of the whole.

That is how we work at ALTERTECNIA: developing industrial projects based on the real conditions of each facility, and coordinating structure, architecture and building services within a single technical process.

If you are considering an industrial extension to an existing building, you can get in touch with our team to discuss your case.

Share LinkedIn WhatsApp Email
ALTERTECNIA · Engineering · Architecture · ConsultingOctober 28, 2026
Technical enquiry

Planning a project?

Tell us about the space and the activity. We will reply with a first technical and legal assessment.

Write to us 93 193 93 09
Email
marketing@altertecnia.com
Office
Edificio BMC, Ronda Maiols 1, local 119
08192 Sant Quirze del Vallès, Barcelona
View on Google Maps ↗
LinkedIn · ALTERTECNIA